Preliminary activities for the preparation of the construction site and the provision of equipment have started, including cutting of vegetation and preventive war reclamation of the areas where the water Trissino detention basin will be built, in the municipality of Arzignano (Vicenza province, North Italy).
BETA Studio is in charge of the Works Management and Safety Coordination during the implementation phase.
The downstream basin will complete the hydraulic defence works already carried out in the municipality of Trissino (mountain basin) and will allow for the protection of the territories downstream along the waterway.