The BreBeMi motorway project is based on the indications of the Environmental Impact Study conducted under the Preliminary Project framework. The motorway runs through 49 km, between Brescia and the junction with TEM-A58 (Milan outer ring road); the stretch being planned is about 62 km long.
BETA Studio was entrusted with the design of the hydraulic structures connected with the motorway and includes the resolution of interferences with the reclamation and irrigation network, the sizing of bridges and viaducts to meet hydraulic requirements, the definition of drainage works along the railway, bridges, viaducts, tunnels underpasses and access roads.