News

BETA Studio > News > Secchia River: works to fix the dykes
BETA Studio > News > Secchia River: works to fix the dykes

Secchia River: works to fix the dykes

AfDB: Banca Africana di Sviluppo; BID: Banca Interamericana di Sviluppo; BM: Banca Mondiale; UE: Unione Europea

BETA Studio has been awarded the contract for the Supervision of works related to the interventions for the adaptation of the dyke system downstream of the Secchia river flood retention basin (Modena province, Italy), Client: Interregional Agency for the Po river – A.I.P.O. The interventions tend to fix the defensive system of the river, damaged after 2015 flooding event.

Go to Top